LCLS-2 LLRF Working Meeting at FNAL

US/Central
Matt Boyes (SLAC)
Description
This is the home for the team meeting on the LLRF systems for the LCLS-2 project held at FNAL on Feb 1 and 2, 2017 The team meetings will be in the IARC building. C3 on the map. ‎ http://news.fnal.gov/wp-content/uploads/2015/08/Fermilab_SiteMap.pdf Wednesday we will meet on the first floor Rm# 1WA Thursday we will meet on the third floor all the way at the end - Floating Point Attending: Remotely: REMOTE CONNECTION INFORMATION: https://global.gotomeeting.com/join/282503829 You can also dial in using your phone. United States : +1 (571) 317-3112 Access Code: 282-503-829
  • Wednesday, 1 February
    • Hardware Reports: Lab/Chassis/Hardware Status LBNL, SLAC, FNAL, JLAB
    • Production Design Modification/Review

      RF Station/PRC (includes all boards) Resonance
      Power supply
      Interlock

    • Lunch
    • EPICS Integration Status
    • Firmware Status
    • Rack and Rack Cooling
    • Plans for CMTF/S tests
    • No Host Dinner (optional) no host

      no host

  • Thursday, 2 February
    • PDR to FDR Strategy Session
    • 3.9 GHz
    • Heater Control Interface
    • Gun+Buncher
    • Commissioning Plans
    • Lunch Cafeteria

      Cafeteria

    • MO/LO Status, SLAC integration
    • Production Discussion

      Next Steps/Who does what/Preproduction/Test Benches